NOTABLE ASSIGNMENTS:
- Machinery Breakdown Claim: Triumph Power Generation Ltd, Nairobi. Engine Failure and Conloss (USD 4.5 Million)
- Fire claim: Factory Building, Plant and Machinery in foam mattress factory (USD 5 Million)
- Machinery Breakdown Claim: Turbo Charger Failure (USD 180 K)
- Fire Claim: Fire damage to printing machine (USD 2.5 Million)
- Fire Claim: Flood damage to plant and equipment (USD 130 K)
- Fire Claim: Fire damage to 95MVA/220kV transformer (USD 750 K)
- Fire Claim: Fire damage to building and textile machinery (USD 5 Million)
- Impact Damage: Impact damage to undersea gas installations (USD 1 Million)
- Malicious Damage: Malicious damage to mining equipment (USD 1.2 Million)
- Fire Damage: Fire damage to property (USD 1.5 Million)