NOTABLE ASSIGNMENTS:
• Handled an oil and gas claim on a offshore pipeline construction project of US$ 27 mio
• Handled an oil and gas claim on a damaged heater of US$ 5 mio
• Handled an oil and gas claim on a offshore construction project of US$ 3 mio
• Handled a machinery insurance claim for power plant on a damaged generator of US$ 3 mio
• Handled a machinery insurance claim for power plant on a damaged generator of US$ 1.8 mio
• Handled a machinery insurance claim for power plant on a damaged generator circuit breaker of US$ 1 mio
• Handled a machinery insurance claim for power plant on a damaged coal fired boiler of US$ 1 mio
• Handled a machinery insurance claim for power plant on a damaged steam turbine of US$ 1.1 mio
• Handled a property claim for power plant on a damaged machinery of US$ 6 mio
• Handled an oil and gas claim in the settlement amount of US$ 3 mio.
• Handled cargo damage claim to a specific printing machine of US$ 7 mio
• Assisted an oil and gas claim in the settlement amount of US$ 12 mio.
• Handled various cases of large heavy equipment, engineering, and other property losses of up to US$ 1 mio,
Boby is also a Asosiasi Penilai Kerugian Asuransi Indonesia (APKAI) Member.