-
Our Firm
-
Our PresenceOur Presence
-
Our Services
-
IndustriesIndustries
- Client Portal Sign In
- Assign a Claim
- Search
SITUATION
After five claimants were severely injured in an industrial circuit breaker explosion in the US southwest, McLarens was assigned to adjust the loss.
SCENARIO
We quickly built trust and cooperation between the insurer and insured.
OUTCOME
The claim was settled to the satisfaction of all parties, without the need to go to trial. Structured settlements minimised the overall cost to insurers.